This paper proposes a global cumulative constraint for cyclic scheduling problems. In cyclic scheduling a project graph is periodically re-executed on a set of limited capacity resources. The objective is to find an assignment of start times to activities such that the feasible repetition period λ is minimized. Cyclic scheduling is an effective method to maximally exploit available resources by partially overlapping schedule repetitions. In our previous work [4], we have proposed a modular precedence constraint along with its filtering algorithm. The approach was based on the hypothesis that the end times of all activities should be assigned within the period: this allows the use of traditional resource constraints, but may introduce resource inefficiency. The adverse effects are particularly relevant for long activity durations and high resource availability. By relaxing this restriction, the problem becomes much more complicated and specific resource constrained filtering algorithms should be devised. Here, we introduce a global cumulative constraint based on modular arithmetic, that does not require the end times to be within the period. We show the advantages obtained for specific scenarios in terms of solution quality with respect to our previous approach, that was already superior with respect to state of the art techniques.

A. Bonfietti, M. Lombardi, L. Benini, M. Milano (2012). Global Cyclic Cumulative Constraint. Berlin : Springer [10.1007/978-3-642-29828-8_6].

Global Cyclic Cumulative Constraint

BONFIETTI, ALESSIO;LOMBARDI, MICHELE;BENINI, LUCA;MILANO, MICHELA
2012

Abstract

This paper proposes a global cumulative constraint for cyclic scheduling problems. In cyclic scheduling a project graph is periodically re-executed on a set of limited capacity resources. The objective is to find an assignment of start times to activities such that the feasible repetition period λ is minimized. Cyclic scheduling is an effective method to maximally exploit available resources by partially overlapping schedule repetitions. In our previous work [4], we have proposed a modular precedence constraint along with its filtering algorithm. The approach was based on the hypothesis that the end times of all activities should be assigned within the period: this allows the use of traditional resource constraints, but may introduce resource inefficiency. The adverse effects are particularly relevant for long activity durations and high resource availability. By relaxing this restriction, the problem becomes much more complicated and specific resource constrained filtering algorithms should be devised. Here, we introduce a global cumulative constraint based on modular arithmetic, that does not require the end times to be within the period. We show the advantages obtained for specific scenarios in terms of solution quality with respect to our previous approach, that was already superior with respect to state of the art techniques.
2012
Integration of AI and OR Techniques in Contraint Programming for Combinatorial Optimzation Problems
81
96
A. Bonfietti, M. Lombardi, L. Benini, M. Milano (2012). Global Cyclic Cumulative Constraint. Berlin : Springer [10.1007/978-3-642-29828-8_6].
A. Bonfietti; M. Lombardi; L. Benini; M. Milano
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/119496
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 4
  • ???jsp.display-item.citation.isi??? ND
social impact