The latest results and the activities towards the realization of a km3 Cherenkov neutrino detector carried out by the NEMO Collaboration are described. The realization of a Phase-1 project has validated all relevant technologies proposed for the realization of the km3 detector on a test site at 2000 m depth. The realization of a new infrastructure on the candidate Capo Passero site (for Phase-2 project) will provide the possibility to test detector components at 3500 m depth.
A.Capone , S.Aiello , A.Aloisio , F.Ameli , I.Amore , M.Anghinolfi , et al. (2009). RECENT RESULTS AND PERSPECTIVES OF THE NEMO PROJECT. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH. SECTION A, ACCELERATORS, SPECTROMETERS, DETECTORS AND ASSOCIATED EQUIPMENT, 602, 47-53 [10.1016/j.nima.2008.12.025].
RECENT RESULTS AND PERSPECTIVES OF THE NEMO PROJECT.
BAZZOTTI, MARCO;BIAGI, SIMONE;CARMINATI, GIADA;CHIARUSI, TOMMASO;GABRIELLI, ALESSANDRO;GANDOLFI, ENZO;GIACOMELLI, GIORGIO MARIA;MARGIOTTA, ANNARITA;SPURIO, MAURIZIO;
2009
Abstract
The latest results and the activities towards the realization of a km3 Cherenkov neutrino detector carried out by the NEMO Collaboration are described. The realization of a Phase-1 project has validated all relevant technologies proposed for the realization of the km3 detector on a test site at 2000 m depth. The realization of a new infrastructure on the candidate Capo Passero site (for Phase-2 project) will provide the possibility to test detector components at 3500 m depth.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.