VIRGO interferometer commissioning started in September 2003, The complete lock of the interferometer was achieved in October 2004 via several steps. The main commissioning activity deals with improvements in the interferometer stability and sensitivity. The status of the advancement of VIRGO and the short-term plans are discussed here. © 2006 IOP Publishing Ltd.

Acernese, F., Amico, P., Al-Shourbagy, M., Aoudia, S., Avino, S., Babusci, D., et al. (2006). The status of VIRGO. CLASSICAL AND QUANTUM GRAVITY, 23(8), S63-S69 [10.1088/0264-9381/23/8/S09].

The status of VIRGO

Cuoco E.;
2006

Abstract

VIRGO interferometer commissioning started in September 2003, The complete lock of the interferometer was achieved in October 2004 via several steps. The main commissioning activity deals with improvements in the interferometer stability and sensitivity. The status of the advancement of VIRGO and the short-term plans are discussed here. © 2006 IOP Publishing Ltd.
2006
Acernese, F., Amico, P., Al-Shourbagy, M., Aoudia, S., Avino, S., Babusci, D., et al. (2006). The status of VIRGO. CLASSICAL AND QUANTUM GRAVITY, 23(8), S63-S69 [10.1088/0264-9381/23/8/S09].
Acernese, F.; Amico, P.; Al-Shourbagy, M.; Aoudia, S.; Avino, S.; Babusci, D.; Ballardin, G.; Barone, F.; Barsotti, L.; Barsuglia, M.; Beauville, F.; ...espandi
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/998886
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 85
  • ???jsp.display-item.citation.isi??? 80
social impact