A debris flow event occurred in June 1997 in the Dolomites (Eastern Alps, Italy). The phenomenon was directly observed in the field and recorded by a video camera near its initiation area. The debris flow originated shortly after an intense rainstorm (25 mm in 30 min) whose runoff mobilised the loose coarse debris that filled the bottom of the channel in its upper part. The analysis of the steep headwater basin indicates a very short concentration time (9-14 min) that fits the quick hydrological response observed in the field. The debris flow mobilisation was not contemporaneous with the arrival of the peak water discharge in the initiation area probably due to the time required for the saturation of the highly conductive channel-bed material. Channel cross-section measurements taken along the flow channel indicate debris flow peak velocity and discharge ranging from 3.1 to 9.0 m/s and from 23 to 71 m3/s, respectively. Samples collected immediately after deposition were used to determine the water content and bulk density of the material. Channel scouring, fines enrichment and transported volume increase testify erosion and entrainment of material along the flow channel. Field estimates of the rheological properties based on open channel flow of Bingham fluid indicate a yield strength of 5000 ± 400 Pa and relatively low viscosity (60-326 Pa s), probably due to a high percentage of fines (approx. 30%).

Field observations of a debris flow event in the Dolomites / Berti M.; Genevois R.; Simoni A.; Tecca P.R.. - In: GEOMORPHOLOGY. - ISSN 0169-555X. - STAMPA. - 29:3-4(1999), pp. 265-274. [10.1016/S0169-555X(99)00018-5]

Field observations of a debris flow event in the Dolomites

Berti M.;Genevois R.;Simoni A.;
1999

Abstract

A debris flow event occurred in June 1997 in the Dolomites (Eastern Alps, Italy). The phenomenon was directly observed in the field and recorded by a video camera near its initiation area. The debris flow originated shortly after an intense rainstorm (25 mm in 30 min) whose runoff mobilised the loose coarse debris that filled the bottom of the channel in its upper part. The analysis of the steep headwater basin indicates a very short concentration time (9-14 min) that fits the quick hydrological response observed in the field. The debris flow mobilisation was not contemporaneous with the arrival of the peak water discharge in the initiation area probably due to the time required for the saturation of the highly conductive channel-bed material. Channel cross-section measurements taken along the flow channel indicate debris flow peak velocity and discharge ranging from 3.1 to 9.0 m/s and from 23 to 71 m3/s, respectively. Samples collected immediately after deposition were used to determine the water content and bulk density of the material. Channel scouring, fines enrichment and transported volume increase testify erosion and entrainment of material along the flow channel. Field estimates of the rheological properties based on open channel flow of Bingham fluid indicate a yield strength of 5000 ± 400 Pa and relatively low viscosity (60-326 Pa s), probably due to a high percentage of fines (approx. 30%).
1999
Field observations of a debris flow event in the Dolomites / Berti M.; Genevois R.; Simoni A.; Tecca P.R.. - In: GEOMORPHOLOGY. - ISSN 0169-555X. - STAMPA. - 29:3-4(1999), pp. 265-274. [10.1016/S0169-555X(99)00018-5]
Berti M.; Genevois R.; Simoni A.; Tecca P.R.
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/969204
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 206
  • ???jsp.display-item.citation.isi??? 185
social impact