The ITER Central Solenoid (CS) will be manufactured by assembling a stack of six modules, which are under fabrication by the US ITER organization and its subcontractors. The tests of the first CS Module have been performed at the premises of the General Atomics (GA) facility in Poway (US), in order to check compliance to the ITER requirements. Among other tests, the magnet was submitted to exponential dumps of the transport current from different initial values (10, 15, 20, 22.5, 25, 35, 40 kA) down to 0 kA. These tests are aimed at conducting DC breaker commissioning of the test facility and were used to measure the AC losses in the coil during electrodynamic transients. This paper presents the results of these measurements, along with a comparison with analytical computations of the losses in the magnet.

AC Losses in the First ITER CS Module Tests: Experimental Results and Comparison to Analytical Models / Breschi M.; Cavallucci L.; Ribani P.L.; Bonifetto R.; Zappatore A.; Zanino R.; Gauthier F.; Bauer P.; Martovetsky N.. - In: IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY. - ISSN 1051-8223. - ELETTRONICO. - 31:5(2021), pp. 9362338.1-9362338.5. [10.1109/TASC.2021.3061950]

AC Losses in the First ITER CS Module Tests: Experimental Results and Comparison to Analytical Models

Breschi M.
;
Cavallucci L.;Ribani P. L.;
2021

Abstract

The ITER Central Solenoid (CS) will be manufactured by assembling a stack of six modules, which are under fabrication by the US ITER organization and its subcontractors. The tests of the first CS Module have been performed at the premises of the General Atomics (GA) facility in Poway (US), in order to check compliance to the ITER requirements. Among other tests, the magnet was submitted to exponential dumps of the transport current from different initial values (10, 15, 20, 22.5, 25, 35, 40 kA) down to 0 kA. These tests are aimed at conducting DC breaker commissioning of the test facility and were used to measure the AC losses in the coil during electrodynamic transients. This paper presents the results of these measurements, along with a comparison with analytical computations of the losses in the magnet.
2021
AC Losses in the First ITER CS Module Tests: Experimental Results and Comparison to Analytical Models / Breschi M.; Cavallucci L.; Ribani P.L.; Bonifetto R.; Zappatore A.; Zanino R.; Gauthier F.; Bauer P.; Martovetsky N.. - In: IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY. - ISSN 1051-8223. - ELETTRONICO. - 31:5(2021), pp. 9362338.1-9362338.5. [10.1109/TASC.2021.3061950]
Breschi M.; Cavallucci L.; Ribani P.L.; Bonifetto R.; Zappatore A.; Zanino R.; Gauthier F.; Bauer P.; Martovetsky N.
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/875281
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 11
  • ???jsp.display-item.citation.isi??? 10
social impact