During February and May 2008, CMS participated to the Combined Computing Readiness Challenge (CCRC’08) together with all other LHC experiments. The purpose of this worldwide exercise was to check the readiness of the Computing infrastructure for LHC data taking. Another set of ma jor CMS tests called Computing, Software and Analysis challenge (CSA’08) - as well as CMS cosmic runs - were also running at the same time: CCRC augmented the load on computing with additional tests to validate and stress-test all CMS computing workflows at full data taking scale, also extending this to the global WLCG community. CMS exercised most aspects of the CMS computing model, with very comprehensive tests. During May 2008, CMS moved more than 3.6 Petabytes among more than 300 links in the complex Grid topology. CMS demonstrated that is able to safely move data out of CERN to the Tier-1 sites, sustaining more than 600 MB/s as a daily average for more than seven days in a row, with enough headroom and with hourly peaks of up to 1.7 GB/s. CMS ran hundreds of simultaneous jobs at each Tier-1 site, re-reconstructing and skimming hundreds of millions of events. After re-reconstruction the fresh AOD (Analysis Object Data) has to be synchronized between Tier-1 centers: CMS demonstrated that the required inter-Tier-1 transfers are achievable within a few days. CMS also showed that skimmed analysis data sets can be transferred to Tier-2 sites for analysis at sufficient rate, regionally as well as inter-regionally, achieving all goals in about 90% of >200 links. Simultaneously, CMS also ran a large Tier-2 analysis exercise, where realistic analysis jobs were submitted to a large set of Tier-2 sites by a large number of people to produce a chaotic workload across the systems, and with more than 400 analysis users in May. Taken all together, CMS routinely achieved submissions of 100k jobs/day, with peaks up to 200k jobs/day. The achieved results in CCRC’08 - focussing on the distributed workflows - are presented and discussed.

D. Bonacorsi, L. Bauerdick (2009). CMS results in the Combined Computing Readiness Challenge (CCRC’08) [10.1016/j.nuclphysbps.2009.10.044].

CMS results in the Combined Computing Readiness Challenge (CCRC’08)

BONACORSI, DANIELE;
2009

Abstract

During February and May 2008, CMS participated to the Combined Computing Readiness Challenge (CCRC’08) together with all other LHC experiments. The purpose of this worldwide exercise was to check the readiness of the Computing infrastructure for LHC data taking. Another set of ma jor CMS tests called Computing, Software and Analysis challenge (CSA’08) - as well as CMS cosmic runs - were also running at the same time: CCRC augmented the load on computing with additional tests to validate and stress-test all CMS computing workflows at full data taking scale, also extending this to the global WLCG community. CMS exercised most aspects of the CMS computing model, with very comprehensive tests. During May 2008, CMS moved more than 3.6 Petabytes among more than 300 links in the complex Grid topology. CMS demonstrated that is able to safely move data out of CERN to the Tier-1 sites, sustaining more than 600 MB/s as a daily average for more than seven days in a row, with enough headroom and with hourly peaks of up to 1.7 GB/s. CMS ran hundreds of simultaneous jobs at each Tier-1 site, re-reconstructing and skimming hundreds of millions of events. After re-reconstruction the fresh AOD (Analysis Object Data) has to be synchronized between Tier-1 centers: CMS demonstrated that the required inter-Tier-1 transfers are achievable within a few days. CMS also showed that skimmed analysis data sets can be transferred to Tier-2 sites for analysis at sufficient rate, regionally as well as inter-regionally, achieving all goals in about 90% of >200 links. Simultaneously, CMS also ran a large Tier-2 analysis exercise, where realistic analysis jobs were submitted to a large set of Tier-2 sites by a large number of people to produce a chaotic workload across the systems, and with more than 400 analysis users in May. Taken all together, CMS routinely achieved submissions of 100k jobs/day, with peaks up to 200k jobs/day. The achieved results in CCRC’08 - focussing on the distributed workflows - are presented and discussed.
2009
99
108
D. Bonacorsi, L. Bauerdick (2009). CMS results in the Combined Computing Readiness Challenge (CCRC’08) [10.1016/j.nuclphysbps.2009.10.044].
D. Bonacorsi; L. Bauerdick
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/86834
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 5
  • ???jsp.display-item.citation.isi??? 5
social impact