Aim of this paper is to demonstrate the effectiveness of a reliability- A nd cost-based revision of maintenance tasks' time-to-replace values to reduce the cost of maintenance in a complex environment represented by a highly constrained scheduling problem. This study takes inspiration from a real application of the tasks/actions scheduling process on an automatic packaging machines that counts hundreds of components subject to failures and replacements. The introduction of a robust reliability analysis for time-tofailure prediction combined with a unit cost minimization model applied to the single component of the machine suggests which tasks have to be revised. This approach is applied to a case study and the obtained results are discussed.

Manzini R., Accorsi R., Gallo A., Penazzi S. (2021). Time-to-replace revision in a cost-based scheduling problem of preventive maintenance. International Society of Science and Applied Technologies.

Time-to-replace revision in a cost-based scheduling problem of preventive maintenance

Manzini R.
Primo
Methodology
;
Accorsi R.
Secondo
Software
;
Gallo A.
Formal Analysis
;
2021

Abstract

Aim of this paper is to demonstrate the effectiveness of a reliability- A nd cost-based revision of maintenance tasks' time-to-replace values to reduce the cost of maintenance in a complex environment represented by a highly constrained scheduling problem. This study takes inspiration from a real application of the tasks/actions scheduling process on an automatic packaging machines that counts hundreds of components subject to failures and replacements. The introduction of a robust reliability analysis for time-tofailure prediction combined with a unit cost minimization model applied to the single component of the machine suggests which tasks have to be revised. This approach is applied to a case study and the obtained results are discussed.
2021
Proceedings - 26th ISSAT International Conference on Reliability and Quality in Design, RQD 2021
1
5
Manzini R., Accorsi R., Gallo A., Penazzi S. (2021). Time-to-replace revision in a cost-based scheduling problem of preventive maintenance. International Society of Science and Applied Technologies.
Manzini R.; Accorsi R.; Gallo A.; Penazzi S.
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/862860
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 1
  • ???jsp.display-item.citation.isi??? ND
social impact