Aim of this paper is to demonstrate the effectiveness of a reliability- A nd cost-based revision of maintenance tasks' time-to-replace values to reduce the cost of maintenance in a complex environment represented by a highly constrained scheduling problem. This study takes inspiration from a real application of the tasks/actions scheduling process on an automatic packaging machines that counts hundreds of components subject to failures and replacements. The introduction of a robust reliability analysis for time-tofailure prediction combined with a unit cost minimization model applied to the single component of the machine suggests which tasks have to be revised. This approach is applied to a case study and the obtained results are discussed.
Manzini R., Accorsi R., Gallo A., Penazzi S. (2021). Time-to-replace revision in a cost-based scheduling problem of preventive maintenance. International Society of Science and Applied Technologies.
Time-to-replace revision in a cost-based scheduling problem of preventive maintenance
Manzini R.
Primo
Methodology
;Accorsi R.Secondo
Software
;Gallo A.Formal Analysis
;
2021
Abstract
Aim of this paper is to demonstrate the effectiveness of a reliability- A nd cost-based revision of maintenance tasks' time-to-replace values to reduce the cost of maintenance in a complex environment represented by a highly constrained scheduling problem. This study takes inspiration from a real application of the tasks/actions scheduling process on an automatic packaging machines that counts hundreds of components subject to failures and replacements. The introduction of a robust reliability analysis for time-tofailure prediction combined with a unit cost minimization model applied to the single component of the machine suggests which tasks have to be revised. This approach is applied to a case study and the obtained results are discussed.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.