Construction schedule is the most important construction document as it indicates total project duration, project stages and times of activities, costs, logical sequences, quality and safety. Therefore, quality of a phase schedule presented by a contractor needs to be assessed by the owner’s consultant before the commencement of works or in the bidding phase. Only few international standards concerning schedule quality exist, and most of them are not specific for construction. A construction-oriented schedule quality evaluation procedure based upon a set of 75 requirements has been proposed. With the aim of performing the proof-of-concept of the proposed method, three different versions of a construction schedule for case study of a seismic rehabilitation project have been evaluated.

Il cronoprogramma è il documento più importante della costruzione in quanto indica la durata complessiva dei lavori, le fasi, i tempi, i costi, le dipendenze logiche, la qualità e la sicurezza. Pertanto, la qualità del programma dei lavori presentato da un appaltatore deve essere valutata prima della consegna dei lavori o in fase di appalto. Sono pochi gli standard internazionali di riferimento per la qualità della programmazione e la maggior parte di essi non è specifica per il settore delle costruzioni. Si propone una procedura di valutazione della qualità specifico per il settore delle costruzioni basato su 75 requisiti. Con lo scopo di realizzare un proof-of-concept del metodo proposto, si analizzano tre differenti programmi per uno stesso caso di studio di riqualificazione sismica.

Marco A. Bragadin, Kalle Kähkönen (2020). Valutazione della qualità del Cronoprogramma per il Construction Project Management - Schedule Quality Evaluation for Construction Project Management. TECHNE, 20, 175-183 [10.13128/techne-8056].

Valutazione della qualità del Cronoprogramma per il Construction Project Management - Schedule Quality Evaluation for Construction Project Management

Marco A. Bragadin
;
Kalle Kähkönen
2020

Abstract

Construction schedule is the most important construction document as it indicates total project duration, project stages and times of activities, costs, logical sequences, quality and safety. Therefore, quality of a phase schedule presented by a contractor needs to be assessed by the owner’s consultant before the commencement of works or in the bidding phase. Only few international standards concerning schedule quality exist, and most of them are not specific for construction. A construction-oriented schedule quality evaluation procedure based upon a set of 75 requirements has been proposed. With the aim of performing the proof-of-concept of the proposed method, three different versions of a construction schedule for case study of a seismic rehabilitation project have been evaluated.
2020
Marco A. Bragadin, Kalle Kähkönen (2020). Valutazione della qualità del Cronoprogramma per il Construction Project Management - Schedule Quality Evaluation for Construction Project Management. TECHNE, 20, 175-183 [10.13128/techne-8056].
Marco A. Bragadin; Kalle Kähkönen
File in questo prodotto:
File Dimensione Formato  
bragadin kahkonen techne 2020 published.pdf

accesso aperto

Tipo: Versione (PDF) editoriale
Licenza: Licenza per Accesso Aperto. Creative Commons Attribuzione (CCBY)
Dimensione 1.14 MB
Formato Adobe PDF
1.14 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/800604
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? 0
social impact