Construction schedule is the most important construction document as it indicates total project duration, project stages and times of activities, costs, logical sequences, quality and safety. Therefore, quality of a phase schedule presented by a contractor needs to be assessed by the owner’s consultant before the commencement of works or in the bidding phase. Only few international standards concerning schedule quality exist, and most of them are not specific for construction. A construction-oriented schedule quality evaluation procedure based upon a set of 75 requirements has been proposed. With the aim of performing the proof-of-concept of the proposed method, three different versions of a construction schedule for case study of a seismic rehabilitation project have been evaluated.
Il cronoprogramma è il documento più importante della costruzione in quanto indica la durata complessiva dei lavori, le fasi, i tempi, i costi, le dipendenze logiche, la qualità e la sicurezza. Pertanto, la qualità del programma dei lavori presentato da un appaltatore deve essere valutata prima della consegna dei lavori o in fase di appalto. Sono pochi gli standard internazionali di riferimento per la qualità della programmazione e la maggior parte di essi non è specifica per il settore delle costruzioni. Si propone una procedura di valutazione della qualità specifico per il settore delle costruzioni basato su 75 requisiti. Con lo scopo di realizzare un proof-of-concept del metodo proposto, si analizzano tre differenti programmi per uno stesso caso di studio di riqualificazione sismica.
Marco A. Bragadin, Kalle Kähkönen (2020). Valutazione della qualità del Cronoprogramma per il Construction Project Management - Schedule Quality Evaluation for Construction Project Management. TECHNE, 20, 175-183 [10.13128/techne-8056].
Valutazione della qualità del Cronoprogramma per il Construction Project Management - Schedule Quality Evaluation for Construction Project Management
Marco A. Bragadin
;Kalle Kähkönen
2020
Abstract
Construction schedule is the most important construction document as it indicates total project duration, project stages and times of activities, costs, logical sequences, quality and safety. Therefore, quality of a phase schedule presented by a contractor needs to be assessed by the owner’s consultant before the commencement of works or in the bidding phase. Only few international standards concerning schedule quality exist, and most of them are not specific for construction. A construction-oriented schedule quality evaluation procedure based upon a set of 75 requirements has been proposed. With the aim of performing the proof-of-concept of the proposed method, three different versions of a construction schedule for case study of a seismic rehabilitation project have been evaluated.File | Dimensione | Formato | |
---|---|---|---|
bragadin kahkonen techne 2020 published.pdf
accesso aperto
Tipo:
Versione (PDF) editoriale
Licenza:
Licenza per Accesso Aperto. Creative Commons Attribuzione (CCBY)
Dimensione
1.14 MB
Formato
Adobe PDF
|
1.14 MB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.