Between 27 September and 7 November 2016 and September 11 September and 19 October 2017, the Qantir-Pi-Ramesse mission conducted two seasons of small-scale fieldwork in order to prepare for a larger project, planned for the future. The site of excavation was chosen based on the results of the previous magnetic survey and the endangerment of the site by modern settlement activities. Thus, an area was chosen in close proximity of the modern settlement of Qantir in which the survey was showing a large-scale palace- or temple structure. The major results will be discussed within this article.
Henning Franzmeier (In stampa/Attività in corso). Qantir Pi-Ramesse – Preliminary Report on the 2016 and 2017 Seasons.
Qantir Pi-Ramesse – Preliminary Report on the 2016 and 2017 Seasons
Henning FranzmeierWriting – Original Draft Preparation
In corso di stampa
Abstract
Between 27 September and 7 November 2016 and September 11 September and 19 October 2017, the Qantir-Pi-Ramesse mission conducted two seasons of small-scale fieldwork in order to prepare for a larger project, planned for the future. The site of excavation was chosen based on the results of the previous magnetic survey and the endangerment of the site by modern settlement activities. Thus, an area was chosen in close proximity of the modern settlement of Qantir in which the survey was showing a large-scale palace- or temple structure. The major results will be discussed within this article.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.