The paper presents the general scheme and the relevant implementation of a Maximum Efficiency Point Tracking (MEPT) system for a Small Hydro Power (SHP) plant equipped with a variable-speed generator. This last consists of a Doubly Fed Induction Generator (DFIG) and a power electronic converter that independently controls both the rotor speed and the generator power factor. The MEPT is designed to be used with a propeller turbine with adjustable runner blade angle and it is coupled with the headwater level regulator. Such a regulator imposes the water flow to the turbine. The conceived MEPT periodically tries to improve the production efficiency by solving a constrained optimization problem, subject to the feasibility operating constraint of the SHP unit and to the equality constraint which forces to meet the water flow value provided by the headwater regulator.

Maximum Efficiency Point Tracking for Adjustable-Speed Small Hydro Power Plant / A. Borghetti; M. Di Silvestro; G. Naldi; M. Paolone; M. Alberti. - ELETTRONICO. - (2008), pp. 1-7. (Intervento presentato al convegno 16th Power Systems Computation Conference, PSCC 2008 tenutosi a Glasgow, United Kingdom nel July 14-18, 2008).

Maximum Efficiency Point Tracking for Adjustable-Speed Small Hydro Power Plant

BORGHETTI, ALBERTO;DI SILVESTRO, MAURO;NALDI, GIOVANNI;PAOLONE, MARIO;
2008

Abstract

The paper presents the general scheme and the relevant implementation of a Maximum Efficiency Point Tracking (MEPT) system for a Small Hydro Power (SHP) plant equipped with a variable-speed generator. This last consists of a Doubly Fed Induction Generator (DFIG) and a power electronic converter that independently controls both the rotor speed and the generator power factor. The MEPT is designed to be used with a propeller turbine with adjustable runner blade angle and it is coupled with the headwater level regulator. Such a regulator imposes the water flow to the turbine. The conceived MEPT periodically tries to improve the production efficiency by solving a constrained optimization problem, subject to the feasibility operating constraint of the SHP unit and to the equality constraint which forces to meet the water flow value provided by the headwater regulator.
2008
Proceedings of the 16th Power Systems Computation Conference, PSCC 2008
1
7
Maximum Efficiency Point Tracking for Adjustable-Speed Small Hydro Power Plant / A. Borghetti; M. Di Silvestro; G. Naldi; M. Paolone; M. Alberti. - ELETTRONICO. - (2008), pp. 1-7. (Intervento presentato al convegno 16th Power Systems Computation Conference, PSCC 2008 tenutosi a Glasgow, United Kingdom nel July 14-18, 2008).
A. Borghetti; M. Di Silvestro; G. Naldi; M. Paolone; M. Alberti
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/67206
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 13
  • ???jsp.display-item.citation.isi??? ND
social impact