On a daily basis, large-scale disruptions require infrastructure managers and railway operators to reschedule their railway timetables together with their rolling stock and crew schedules. This research focuses on timetable rescheduling for passenger train services on a macroscopic level in a railway network. An integer linear programming model is formulated for solving the timetable rescheduling problem, which minimizes the number of cancelled and delayed train services while adhering to infrastructure and rolling stock capacity constraints. The possibility of rerouting train services to reduce the number of cancelled and delayed train services is also considered. In addition, all stages of the disruption management process (from the start of the disruption to the time the normal situation is restored) are taken into account. Computational tests of the described model on a heavily used part of the Dutch railway network show that the model is able to find optimal solutions in short computation times. This makes the approach applicable for use in practice.

A railway timetable rescheduling approach for handling large-scale disruptions / Veelenturf, Lucas P.; Kidd, Martin P.; Cacchiani, Valentina; Kroon, Leo G.; Toth, Paolo. - In: TRANSPORTATION SCIENCE. - ISSN 0041-1655. - STAMPA. - 50:3(2016), pp. 841-862. [10.1287/trsc.2015.0618]

A railway timetable rescheduling approach for handling large-scale disruptions

CACCHIANI, VALENTINA;TOTH, PAOLO
2016

Abstract

On a daily basis, large-scale disruptions require infrastructure managers and railway operators to reschedule their railway timetables together with their rolling stock and crew schedules. This research focuses on timetable rescheduling for passenger train services on a macroscopic level in a railway network. An integer linear programming model is formulated for solving the timetable rescheduling problem, which minimizes the number of cancelled and delayed train services while adhering to infrastructure and rolling stock capacity constraints. The possibility of rerouting train services to reduce the number of cancelled and delayed train services is also considered. In addition, all stages of the disruption management process (from the start of the disruption to the time the normal situation is restored) are taken into account. Computational tests of the described model on a heavily used part of the Dutch railway network show that the model is able to find optimal solutions in short computation times. This makes the approach applicable for use in practice.
2016
A railway timetable rescheduling approach for handling large-scale disruptions / Veelenturf, Lucas P.; Kidd, Martin P.; Cacchiani, Valentina; Kroon, Leo G.; Toth, Paolo. - In: TRANSPORTATION SCIENCE. - ISSN 0041-1655. - STAMPA. - 50:3(2016), pp. 841-862. [10.1287/trsc.2015.0618]
Veelenturf, Lucas P.; Kidd, Martin P.; Cacchiani, Valentina; Kroon, Leo G.; Toth, Paolo
File in questo prodotto:
File Dimensione Formato  
TSCI2016_postprint.pdf

accesso aperto

Tipo: Postprint
Licenza: Licenza per Accesso Aperto. Creative Commons Attribuzione - Non commerciale (CCBYNC)
Dimensione 545 kB
Formato Adobe PDF
545 kB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/566657
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 139
  • ???jsp.display-item.citation.isi??? 115
social impact