In order to increase flexibility and reduce costs, several companies adopt mixed-model assembly lines whose output products are variations of the same basic model with specific and distinctive attributes. Unfortunately, such attributes typically lead to variations in the task process times. In the case of un-paced buffered assembly lines, these variations are smoothed by buffers with consequences in terms of work-in-progress, costs, space utilisation and lower productivity control. To face such weaknesses, some companies adopt paced un-buffered assembly lines where the cycle time is controlled by the continuous/synchronous moving of the products from the first to the last assembly station. In such contexts, the possibility of assembling different models with different assembly times can be managed through the use of supplementary flexible workforce. This article introduces an innovative balancing and sequencing hierarchical approach for paced mixed-model assembly lines using supplementary flexible workforce called 'jolly operators'. The goals are to minimise the number of jolly operators and to limit the occurrence of work-overloads, which typically result in out-of-the-line assembly completion. The proposed approach is preliminary validated and applied to a case study from an Italian company assembling industrial air-dryers.

Faccio, M., Gamberi, M., Bortolini, M. (2016). Hierarchical approach for paced mixed-model assembly line balancing and sequencing with jolly operators. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 54(3), 761-777 [10.1080/00207543.2015.1059965].

Hierarchical approach for paced mixed-model assembly line balancing and sequencing with jolly operators

GAMBERI, MAURO;BORTOLINI, MARCO
2016

Abstract

In order to increase flexibility and reduce costs, several companies adopt mixed-model assembly lines whose output products are variations of the same basic model with specific and distinctive attributes. Unfortunately, such attributes typically lead to variations in the task process times. In the case of un-paced buffered assembly lines, these variations are smoothed by buffers with consequences in terms of work-in-progress, costs, space utilisation and lower productivity control. To face such weaknesses, some companies adopt paced un-buffered assembly lines where the cycle time is controlled by the continuous/synchronous moving of the products from the first to the last assembly station. In such contexts, the possibility of assembling different models with different assembly times can be managed through the use of supplementary flexible workforce. This article introduces an innovative balancing and sequencing hierarchical approach for paced mixed-model assembly lines using supplementary flexible workforce called 'jolly operators'. The goals are to minimise the number of jolly operators and to limit the occurrence of work-overloads, which typically result in out-of-the-line assembly completion. The proposed approach is preliminary validated and applied to a case study from an Italian company assembling industrial air-dryers.
2016
Faccio, M., Gamberi, M., Bortolini, M. (2016). Hierarchical approach for paced mixed-model assembly line balancing and sequencing with jolly operators. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 54(3), 761-777 [10.1080/00207543.2015.1059965].
Faccio, Maurizio; Gamberi, Mauro; Bortolini, Marco
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/551460
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 31
  • ???jsp.display-item.citation.isi??? 27
social impact