The hydraulic behaviour and effluent pollutant concentrations in a pilot-scale two-stage subsurface flow constructed wetland for treatment of municipal wastewater have been simulated. The experimental pilot plant is located in San Michele di Ganzaria (Eastern Sicily) and consists of four lines of two-stage subsurface flow constructed wetlands for secondary or tertiary treatment of municipal wastewater. The first stage, for each line, consists of a horizontal flow bed, while in the second stage a vertical flow bed operates for two lines and a horizontal flow bed for the other two. Phragmites sp. was used as vegetation in two lines while the other two lines are without plants. The HYDRUS-2D software was applied to describe flow and single-solute transport, while the multi-component reactive transport module CW2D was used to model the transformation and elimination processes of organic matter, nitrogen and phosphorus. Tracer studies and chemical wastewater analyses were carried out to calibrate and validate the transport model. In general, the simulation results obtained show a good match with the measured data for water flow, tracer experiments and pollutant removal processes. © 2008 Elsevier B.V. All rights reserved.

Modelling pollutant removal in a pilot-scale two-stage subsurface flow constructed wetlands / Toscano, A.; Langergraber, G.; Consoli, S.; Cirelli, G.L.. - In: ECOLOGICAL ENGINEERING. - ISSN 0925-8574. - STAMPA. - 35:2(2009), pp. 281-289. [10.1016/j.ecoleng.2008.07.011]

Modelling pollutant removal in a pilot-scale two-stage subsurface flow constructed wetlands

TOSCANO, ATTILIO;
2009

Abstract

The hydraulic behaviour and effluent pollutant concentrations in a pilot-scale two-stage subsurface flow constructed wetland for treatment of municipal wastewater have been simulated. The experimental pilot plant is located in San Michele di Ganzaria (Eastern Sicily) and consists of four lines of two-stage subsurface flow constructed wetlands for secondary or tertiary treatment of municipal wastewater. The first stage, for each line, consists of a horizontal flow bed, while in the second stage a vertical flow bed operates for two lines and a horizontal flow bed for the other two. Phragmites sp. was used as vegetation in two lines while the other two lines are without plants. The HYDRUS-2D software was applied to describe flow and single-solute transport, while the multi-component reactive transport module CW2D was used to model the transformation and elimination processes of organic matter, nitrogen and phosphorus. Tracer studies and chemical wastewater analyses were carried out to calibrate and validate the transport model. In general, the simulation results obtained show a good match with the measured data for water flow, tracer experiments and pollutant removal processes. © 2008 Elsevier B.V. All rights reserved.
2009
Modelling pollutant removal in a pilot-scale two-stage subsurface flow constructed wetlands / Toscano, A.; Langergraber, G.; Consoli, S.; Cirelli, G.L.. - In: ECOLOGICAL ENGINEERING. - ISSN 0925-8574. - STAMPA. - 35:2(2009), pp. 281-289. [10.1016/j.ecoleng.2008.07.011]
Toscano, A.; Langergraber, G.; Consoli, S.; Cirelli, G.L.
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/518323
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 81
  • ???jsp.display-item.citation.isi??? 71
social impact