The paper presents a two-stage scheduler for the optimal scheduling of distributed energy resources (DER) connected to a distribution network. The proposed approach integrates a centralized day-ahead scheduler with an intra-day one. On the one hand, the day-ahead scheduler calculates the active power set points during the following day taking into account both technical and economic objectives and constraints. On the other hand, the intra-day scheduler takes into account the results of the day-ahead one and updates every 15 minutes the DERs set points for the optimization of the network voltage profiles. The paper describes the implementation of the proposed twostage scheduler algorithm into a computer code based on a JavaScript link between Matlab and EMTP-RV simulation environments and presents the results obtained for the case of a network configuration adapted from the IEEE 34-node test distribution feeder.

A. Borghetti, M. Bosetti, S. Grillo, A. Morini, M. Paolone, F. Silvestro (2007). A Two-Stage Scheduler of Distributed Energy Resources. PISCATAWAY : IEEE.

A Two-Stage Scheduler of Distributed Energy Resources

BORGHETTI, ALBERTO;BOSETTI, MAURO;PAOLONE, MARIO;
2007

Abstract

The paper presents a two-stage scheduler for the optimal scheduling of distributed energy resources (DER) connected to a distribution network. The proposed approach integrates a centralized day-ahead scheduler with an intra-day one. On the one hand, the day-ahead scheduler calculates the active power set points during the following day taking into account both technical and economic objectives and constraints. On the other hand, the intra-day scheduler takes into account the results of the day-ahead one and updates every 15 minutes the DERs set points for the optimization of the network voltage profiles. The paper describes the implementation of the proposed twostage scheduler algorithm into a computer code based on a JavaScript link between Matlab and EMTP-RV simulation environments and presents the results obtained for the case of a network configuration adapted from the IEEE 34-node test distribution feeder.
2007
Power Tech 2007 Proceedings CD
1
6
A. Borghetti, M. Bosetti, S. Grillo, A. Morini, M. Paolone, F. Silvestro (2007). A Two-Stage Scheduler of Distributed Energy Resources. PISCATAWAY : IEEE.
A. Borghetti; M. Bosetti; S. Grillo; A. Morini; M. Paolone; F. Silvestro
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/46200
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 21
  • ???jsp.display-item.citation.isi??? ND
social impact