Abstract Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM). Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project. Abstract La gestione della fase esecutiva del processo edilizio, Construction Management, ha come processo fondamentale la pianificazione ed il controllo. In pratica la programmazione dei lavori è spesso realizzata tramite tecniche reticolari come il PDM, tuttavia ricercatori ed operatori ritengono che le tecniche reticolari non siano del tutto adeguate per la costruzione, in quanto non sono focalizzate sull’impiego delle risorse ed il loro flusso nel progetto. Si propone quindi un metodo di programmazione che ottimizzi la schedulazione delle risorse, il REPNET, che è una procedura euristica basata su di un reticolo PDM organizzato in un piano risorse–spazio e presentato con la tecnica flow-line. Il REPNET procede alla programmazione delle risorse ottimizzandone sia l’impiego che il flusso del lavoro, come presentato con un semplice esempio.

Bragadin, M.A., K., K. (2013). REPNET: PROJECT SCHEDULING AND WORKFLOW OPTIMIZATION FOR CONSTRUCTION PROJECTS REPNET: OTTIMIZZAZIONE DELLA PROGRAMMAZIONE DEI LAVORI PER I PROGETTI DI COSTRUZIONE. Bologna : ALMA-DL Università di Bologna [10.6092/issn.2036-1602/4054].

REPNET: PROJECT SCHEDULING AND WORKFLOW OPTIMIZATION FOR CONSTRUCTION PROJECTS REPNET: OTTIMIZZAZIONE DELLA PROGRAMMAZIONE DEI LAVORI PER I PROGETTI DI COSTRUZIONE

BRAGADIN, MARCO ALVISE;
2013

Abstract

Abstract Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM). Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project. Abstract La gestione della fase esecutiva del processo edilizio, Construction Management, ha come processo fondamentale la pianificazione ed il controllo. In pratica la programmazione dei lavori è spesso realizzata tramite tecniche reticolari come il PDM, tuttavia ricercatori ed operatori ritengono che le tecniche reticolari non siano del tutto adeguate per la costruzione, in quanto non sono focalizzate sull’impiego delle risorse ed il loro flusso nel progetto. Si propone quindi un metodo di programmazione che ottimizzi la schedulazione delle risorse, il REPNET, che è una procedura euristica basata su di un reticolo PDM organizzato in un piano risorse–spazio e presentato con la tecnica flow-line. Il REPNET procede alla programmazione delle risorse ottimizzandone sia l’impiego che il flusso del lavoro, come presentato con un semplice esempio.
2013
Construction Management
17
28
Bragadin, M.A., K., K. (2013). REPNET: PROJECT SCHEDULING AND WORKFLOW OPTIMIZATION FOR CONSTRUCTION PROJECTS REPNET: OTTIMIZZAZIONE DELLA PROGRAMMAZIONE DEI LAVORI PER I PROGETTI DI COSTRUZIONE. Bologna : ALMA-DL Università di Bologna [10.6092/issn.2036-1602/4054].
Bragadin, MARCO ALVISE; K., Kahkonen
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/199132
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact