Activities leading to the realization of a km3 Cherenkov neutrino detector, carried out by the NEMO collaboration, are described. Long term exploration of a 3500 m deep site in the Mediterranean close to the Sicilian coast has shown that it is optimal for the installation of the detector. A complete feasibility study, which has considered all the components of the detector, as well as its deployment, has been carried out demonstrating that technological solutions exist for the realization of the km3 detector. The realization of a technological demonstrator (the NEMO Phase 1 project) is under way.
E. Migneco, S. Aiello, E. Amato, M. Ambriola, F. Ameli, G. Andronico, et al. (2005). Status of the NEMO project. NUCLEAR PHYSICS B-PROCEEDINGS SUPPLEMENTS, 138, 191-194 [10.1016/j.nuclphysbps.2004.11.045].
Status of the NEMO project
CHIARUSI, TOMMASO;GABRIELLI, ALESSANDRO;GANDOLFI, ENZO;MARGIOTTA, ANNARITA;MASETTI, MASSIMO;SPURIO, MAURIZIO;ZANARINI, GIANNI
2005
Abstract
Activities leading to the realization of a km3 Cherenkov neutrino detector, carried out by the NEMO collaboration, are described. Long term exploration of a 3500 m deep site in the Mediterranean close to the Sicilian coast has shown that it is optimal for the installation of the detector. A complete feasibility study, which has considered all the components of the detector, as well as its deployment, has been carried out demonstrating that technological solutions exist for the realization of the km3 detector. The realization of a technological demonstrator (the NEMO Phase 1 project) is under way.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.