Before installation into the ALICE experiment, all 87 modules of the TOF system had to undergo a series of tests. Initial check-ups included control of the gas tightness, readout connections quality, and high-voltage tests. Further tests were performed on a specially constructed Cosmic Ray Test Facility, where main characteristics of the modules were scanned under the working high voltage by means of cosmic muons. All TOF channels proved to provide the detection efficiency of more than 97% and time resolution of 80-110 ps, which complies with the ALICE requirements.

Pre-installation tests and calibration of the ALICE TOF modules / A. Akindinov; A. Alici; P. Antonioli; S. Arcelli; Y.W. Baek; M. Basile; G. Cara Romeo; L. Cifarelli; F. Cindolo; A. De Caro; D. De Gruttola; S. De Pasquale; M. Fusco Girard; Yu. Grishuk; D. Hatzifotiadou; H.T. Jung; W.W. Jung; D.S. Kim; D.W. Kim; H.N. Kim; J.S. Kim; S. Kiselev; G. Laurenti; K. Lee; S.C. Lee; D. Malkevich; A. Margotti; R. Nania; A. Nedosekin; F. Noferini; P. Pagano; A. Pesci; O. Pinazza; R. Preghenella; M. Ryabinin; E. Scapparone; G. Scioli; A. Silenzi; K. Voloshin; M.C.S. Williams; C. Zampolli; A. Zichichi. - In: NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH. SECTION A, ACCELERATORS, SPECTROMETERS, DETECTORS AND ASSOCIATED EQUIPMENT. - ISSN 0168-9002. - STAMPA. - 661:(2012), pp. 106-109. [10.1016/j.nima.2010.08.031]

Pre-installation tests and calibration of the ALICE TOF modules.

A. Alici;ARCELLI, SILVIA;BASILE, MAURIZIO;CIFARELLI, LUISA;SCIOLI, GILDA;
2012

Abstract

Before installation into the ALICE experiment, all 87 modules of the TOF system had to undergo a series of tests. Initial check-ups included control of the gas tightness, readout connections quality, and high-voltage tests. Further tests were performed on a specially constructed Cosmic Ray Test Facility, where main characteristics of the modules were scanned under the working high voltage by means of cosmic muons. All TOF channels proved to provide the detection efficiency of more than 97% and time resolution of 80-110 ps, which complies with the ALICE requirements.
2012
Pre-installation tests and calibration of the ALICE TOF modules / A. Akindinov; A. Alici; P. Antonioli; S. Arcelli; Y.W. Baek; M. Basile; G. Cara Romeo; L. Cifarelli; F. Cindolo; A. De Caro; D. De Gruttola; S. De Pasquale; M. Fusco Girard; Yu. Grishuk; D. Hatzifotiadou; H.T. Jung; W.W. Jung; D.S. Kim; D.W. Kim; H.N. Kim; J.S. Kim; S. Kiselev; G. Laurenti; K. Lee; S.C. Lee; D. Malkevich; A. Margotti; R. Nania; A. Nedosekin; F. Noferini; P. Pagano; A. Pesci; O. Pinazza; R. Preghenella; M. Ryabinin; E. Scapparone; G. Scioli; A. Silenzi; K. Voloshin; M.C.S. Williams; C. Zampolli; A. Zichichi. - In: NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH. SECTION A, ACCELERATORS, SPECTROMETERS, DETECTORS AND ASSOCIATED EQUIPMENT. - ISSN 0168-9002. - STAMPA. - 661:(2012), pp. 106-109. [10.1016/j.nima.2010.08.031]
A. Akindinov; A. Alici; P. Antonioli; S. Arcelli; Y.W. Baek; M. Basile; G. Cara Romeo; L. Cifarelli; F. Cindolo; A. De Caro; D. De Gruttola; S. De Pasquale; M. Fusco Girard; Yu. Grishuk; D. Hatzifotiadou; H.T. Jung; W.W. Jung; D.S. Kim; D.W. Kim; H.N. Kim; J.S. Kim; S. Kiselev; G. Laurenti; K. Lee; S.C. Lee; D. Malkevich; A. Margotti; R. Nania; A. Nedosekin; F. Noferini; P. Pagano; A. Pesci; O. Pinazza; R. Preghenella; M. Ryabinin; E. Scapparone; G. Scioli; A. Silenzi; K. Voloshin; M.C.S. Williams; C. Zampolli; A. Zichichi
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/118309
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? 0
social impact