Enhancing production effectiveness and safety of construction projects is one of the most difficult tasks for a project scheduler. The application of Precedence Diagramming Method technique to optimize a project schedule can lead to reduction of total duration thus improving project effectiveness. Besides, minimization of total project duration has always been the aim of networking techniques, but their implementation in construction has been criticized, and many improved methods have been proposed as Location Based Management System and Takt Planning. Nevertheless, networking techniques are still most used scheduling methods for project control. Construction is an high hazard industry, therefore Occupational Safety and Health provisions are of paramount importance. Construction scheduling indicates the sequence of activities, therefore it can be used to eliminate safety risk interactions among activities, time – space clashes between contemporary activities. The proposed approach use Precedence diagramming and a Location Breakdown Structure to eliminate possible interference hazards while supporting process flow detection into single location. The calculation of activity times is the traditional CPM algorithm that has the aim of finding the minimum total project duration. A takt plan is created to visualize the project development and manually optimize both process flow and safety. Safety buffers are inserted mainly on subcritical path thus using activity floats to limit delay of project completion. The process is performed iteratively, until detected time-space hazards are eliminated. An actual case study of building renovation is presented for a sample testing of the approach, that demonstrate the feasibility of the proposed approach. Time – space clashes are avoided, with limited delay of total project duration.

Bragadin, M.A., Balzani, B., Coccolini, D. (2026). Construction effectiveness and safety improvement with project scheduling addressing Lean principles. Institute of Physics [10.1088/1755-1315/1672/1/012014].

Construction effectiveness and safety improvement with project scheduling addressing Lean principles

Bragadin M. A.
Primo
Writing – Original Draft Preparation
;
Balzani B.
Data Curation
;
Coccolini D.
Resources
2026

Abstract

Enhancing production effectiveness and safety of construction projects is one of the most difficult tasks for a project scheduler. The application of Precedence Diagramming Method technique to optimize a project schedule can lead to reduction of total duration thus improving project effectiveness. Besides, minimization of total project duration has always been the aim of networking techniques, but their implementation in construction has been criticized, and many improved methods have been proposed as Location Based Management System and Takt Planning. Nevertheless, networking techniques are still most used scheduling methods for project control. Construction is an high hazard industry, therefore Occupational Safety and Health provisions are of paramount importance. Construction scheduling indicates the sequence of activities, therefore it can be used to eliminate safety risk interactions among activities, time – space clashes between contemporary activities. The proposed approach use Precedence diagramming and a Location Breakdown Structure to eliminate possible interference hazards while supporting process flow detection into single location. The calculation of activity times is the traditional CPM algorithm that has the aim of finding the minimum total project duration. A takt plan is created to visualize the project development and manually optimize both process flow and safety. Safety buffers are inserted mainly on subcritical path thus using activity floats to limit delay of project completion. The process is performed iteratively, until detected time-space hazards are eliminated. An actual case study of building renovation is presented for a sample testing of the approach, that demonstrate the feasibility of the proposed approach. Time – space clashes are avoided, with limited delay of total project duration.
2026
IOP Conference Series: Earth and Environmental Science
1
12
Bragadin, M.A., Balzani, B., Coccolini, D. (2026). Construction effectiveness and safety improvement with project scheduling addressing Lean principles. Institute of Physics [10.1088/1755-1315/1672/1/012014].
Bragadin, M. A.; Balzani, B.; Coccolini, D.
File in questo prodotto:
File Dimensione Formato  
Bragadin_2026_IOP_Conf._Ser.__Earth_Environ._Sci._1672_012014.pdf

accesso aperto

Tipo: Versione (PDF) editoriale / Version Of Record
Licenza: Licenza per Accesso Aperto. Creative Commons Attribuzione (CCBY)
Dimensione 1.65 MB
Formato Adobe PDF
1.65 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/1091995
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? ND
  • OpenAlex ND
social impact