The article Drill and Blast in Gypsum Quarries: Optimization of Technical, Economic, and Safety Aspects in “Monte Tondo” Mid mountain Case Study, written by Daniele Casertano, Francesco Tinti, Sara Kasmaeeyazdi, Vanessa Cellini, and Roberto Bruno was originally published under exclusive license to Society for Mining, Metallurgy & Exploration Inc. 2024 on 9 December 2024. As a result of the subsequent decision to publish the article under the open access model, the article’s copyright notice was changed on 29 December 2025 to © The Author(s) and the article is now distributed under a Creative Commons Attribution CC BY.

Casertano, D., Tinti, F., Kasmaeeyazdi, S., Cellini, V., Bruno, R. (2025). Correction to: Drill and Blast in Gypsum Quarries: Optimization of Technical, Economic, and Safety Aspects in “Monte Tondo” Mid-mountain Case Study (Mining, Metallurgy & Exploration, (2025), 42, 1, (99-113), 10.1007/s42461-024-01133-9). MINING, METALLURGY & EXPLORATION, 42, 1-1 [10.1007/s42461-025-01209-0].

Correction to: Drill and Blast in Gypsum Quarries: Optimization of Technical, Economic, and Safety Aspects in “Monte Tondo” Mid-mountain Case Study (Mining, Metallurgy & Exploration, (2025), 42, 1, (99-113), 10.1007/s42461-024-01133-9)

Tinti F.
;
Kasmaeeyazdi S.;Cellini V.;Bruno R.
2025

Abstract

The article Drill and Blast in Gypsum Quarries: Optimization of Technical, Economic, and Safety Aspects in “Monte Tondo” Mid mountain Case Study, written by Daniele Casertano, Francesco Tinti, Sara Kasmaeeyazdi, Vanessa Cellini, and Roberto Bruno was originally published under exclusive license to Society for Mining, Metallurgy & Exploration Inc. 2024 on 9 December 2024. As a result of the subsequent decision to publish the article under the open access model, the article’s copyright notice was changed on 29 December 2025 to © The Author(s) and the article is now distributed under a Creative Commons Attribution CC BY.
2025
Casertano, D., Tinti, F., Kasmaeeyazdi, S., Cellini, V., Bruno, R. (2025). Correction to: Drill and Blast in Gypsum Quarries: Optimization of Technical, Economic, and Safety Aspects in “Monte Tondo” Mid-mountain Case Study (Mining, Metallurgy & Exploration, (2025), 42, 1, (99-113), 10.1007/s42461-024-01133-9). MINING, METALLURGY & EXPLORATION, 42, 1-1 [10.1007/s42461-025-01209-0].
Casertano, D.; Tinti, F.; Kasmaeeyazdi, S.; Cellini, V.; Bruno, R.
File in questo prodotto:
File Dimensione Formato  
s42461-025-01209-0.pdf

accesso aperto

Descrizione: Letter for Open Access
Tipo: Versione (PDF) editoriale / Version Of Record
Licenza: Licenza per Accesso Aperto. Creative Commons Attribuzione (CCBY)
Dimensione 580.05 kB
Formato Adobe PDF
580.05 kB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/1014460
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? 0
social impact