This README file describes the CD-ROM-2 content (inputs and output results) related to activation calculation for ITER (EFDA Task TW6-TSS-SEA4.1 “Implications on RPrS writing of an increase in the ITER first wall fluence and of an "all tungsten machine”). The activation calculations results contained in this CD-ROM-2 represent complementary results of those included into the CD-ROM-1 prepared in November 2007. The results contained into this CD-ROM-2 have been summarised and discussed into three ENEA reports : - G. Cambi, D.G. Cepraga, ITER Material Activation Report. Case 1): Beryllium as First Wall PFC with First Wall average fluence 1.0 MWa/m2, EFDA Task TW6-TSS-SEA4.1, Deliverable D3, ENEA FUS-TN-SA-SE-R-182, December 2007. - G. Cambi, D.G. Cepraga, ITER Material Activation Report. Case 2): Tungsten as First Wall PFC with First Wall average fluence 0.5 MWa/m2, EFDA Task TW6-TSS-SEA4.1, Deliverable D4, ENEA FUS-TN-SA-SE-R-183, December 2007. - G. Cambi, D.G. Cepraga, ITER Material Activation Report. Case 3): Tungsten as First Wall PFC with First Wall average fluence 1.0 MWa/m2, EFDA Task TW6-TSS-SEA4.1, Deliverable D5, ENEA FUS-TN-SA-SE-R-186, January 2008
G. Cambi, D.G. Cepraga (2008). CD-ROM-2 containing updated ITER-GSSR activation calculation results and detailed tungsten layers activation data and of the related README file (Memo 1/2008/ENEA/FPN/FUS).
CD-ROM-2 containing updated ITER-GSSR activation calculation results and detailed tungsten layers activation data and of the related README file (Memo 1/2008/ENEA/FPN/FUS)
CAMBI, GILIO;
2008
Abstract
This README file describes the CD-ROM-2 content (inputs and output results) related to activation calculation for ITER (EFDA Task TW6-TSS-SEA4.1 “Implications on RPrS writing of an increase in the ITER first wall fluence and of an "all tungsten machine”). The activation calculations results contained in this CD-ROM-2 represent complementary results of those included into the CD-ROM-1 prepared in November 2007. The results contained into this CD-ROM-2 have been summarised and discussed into three ENEA reports : - G. Cambi, D.G. Cepraga, ITER Material Activation Report. Case 1): Beryllium as First Wall PFC with First Wall average fluence 1.0 MWa/m2, EFDA Task TW6-TSS-SEA4.1, Deliverable D3, ENEA FUS-TN-SA-SE-R-182, December 2007. - G. Cambi, D.G. Cepraga, ITER Material Activation Report. Case 2): Tungsten as First Wall PFC with First Wall average fluence 0.5 MWa/m2, EFDA Task TW6-TSS-SEA4.1, Deliverable D4, ENEA FUS-TN-SA-SE-R-183, December 2007. - G. Cambi, D.G. Cepraga, ITER Material Activation Report. Case 3): Tungsten as First Wall PFC with First Wall average fluence 1.0 MWa/m2, EFDA Task TW6-TSS-SEA4.1, Deliverable D5, ENEA FUS-TN-SA-SE-R-186, January 2008I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.