We consider here a price-taker generating company that wants to optimize the operation of a pump-storage multiunit hydro power station for a given time horizon, typically one day or one week. The problem is to determine the commitment and the power generation of the plant so as to maximize the revenue given by power selling. All the units of the plant are assumed to be fed by the same reservoir. The considered horizon is limited to a short term in order to assume that natural inflows to the reservoir and prices are known as previously forecast without taking into account the stochastic aspects of the problem.
Borghetti, A., D’Ambrosio, C., Lodi, A., Martello, S. (2015). Optimal scheduling of a multiunit hydro power station in a short-term planning horizon. New York : Springer [10.1007/978-1-4939-1007-6_8].
Optimal scheduling of a multiunit hydro power station in a short-term planning horizon
BORGHETTI, ALBERTO;D'AMBROSIO, CLAUDIA;LODI, ANDREA;MARTELLO, SILVANO
2015
Abstract
We consider here a price-taker generating company that wants to optimize the operation of a pump-storage multiunit hydro power station for a given time horizon, typically one day or one week. The problem is to determine the commitment and the power generation of the plant so as to maximize the revenue given by power selling. All the units of the plant are assumed to be fed by the same reservoir. The considered horizon is limited to a short term in order to assume that natural inflows to the reservoir and prices are known as previously forecast without taking into account the stochastic aspects of the problem.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.