The chapter reviews all the technological aspects pointed out by the integration of low enthalpy geothermal heat pumps in 10 existing buildings in the Adriatic area, which are the 10 LEGEND pilot cases. The chapter tries to cover all the basic dilemmas that each investor has to face when considering investment into geothermal based heating / cooling system
Francesco Tinti, Dalibor Jovanovic (2014). 3. Practical implementations within LEGEND Project. 3.2 The lessons learnt by the practical implementations.. Ferrara : Italia tipografia.
3. Practical implementations within LEGEND Project. 3.2 The lessons learnt by the practical implementations.
TINTI, FRANCESCO;
2014
Abstract
The chapter reviews all the technological aspects pointed out by the integration of low enthalpy geothermal heat pumps in 10 existing buildings in the Adriatic area, which are the 10 LEGEND pilot cases. The chapter tries to cover all the basic dilemmas that each investor has to face when considering investment into geothermal based heating / cooling systemFile in questo prodotto:
Eventuali allegati, non sono esposti
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.