The chapter reviews all the technological aspects pointed out by the integration of low enthalpy geothermal heat pumps in 10 existing buildings in the Adriatic area, which are the 10 LEGEND pilot cases. The chapter tries to cover all the basic dilemmas that each investor has to face when considering investment into geothermal based heating / cooling system

Francesco Tinti, Dalibor Jovanovic (2014). 3. Practical implementations within LEGEND Project. 3.2 The lessons learnt by the practical implementations.. Ferrara : Italia tipografia.

3. Practical implementations within LEGEND Project. 3.2 The lessons learnt by the practical implementations.

TINTI, FRANCESCO;
2014

Abstract

The chapter reviews all the technological aspects pointed out by the integration of low enthalpy geothermal heat pumps in 10 existing buildings in the Adriatic area, which are the 10 LEGEND pilot cases. The chapter tries to cover all the basic dilemmas that each investor has to face when considering investment into geothermal based heating / cooling system
2014
Ground Source Heat Pumps. An overview on the potential in Adriatic area and the Balkans
46
58
Francesco Tinti, Dalibor Jovanovic (2014). 3. Practical implementations within LEGEND Project. 3.2 The lessons learnt by the practical implementations.. Ferrara : Italia tipografia.
Francesco Tinti; Dalibor Jovanovic
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/404768
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact