This note describes the implementation of a monitoring and control system for the SY1527-based High Voltage power supply system of the Barrel Muon Drift Tube (DT) chambers. This project is part of the slow controls system of the DT detector that will be used at Pit 5. It is based on a PVSS II SCADA system and the JCOP PVSS framework.

S. Braibant, P. Giacomelli, M. Giunta (2004). A PVSS Application for the Slow Control System of SY1527 Power Supply System of the Muon DT Chambers (CMS Internal Note 2004/030). GENEVE : CMS, CERN.

A PVSS Application for the Slow Control System of SY1527 Power Supply System of the Muon DT Chambers (CMS Internal Note 2004/030)

BRAIBANT, SYLVIE;
2004

Abstract

This note describes the implementation of a monitoring and control system for the SY1527-based High Voltage power supply system of the Barrel Muon Drift Tube (DT) chambers. This project is part of the slow controls system of the DT detector that will be used at Pit 5. It is based on a PVSS II SCADA system and the JCOP PVSS framework.
2004
S. Braibant, P. Giacomelli, M. Giunta (2004). A PVSS Application for the Slow Control System of SY1527 Power Supply System of the Muon DT Chambers (CMS Internal Note 2004/030). GENEVE : CMS, CERN.
S. Braibant; P. Giacomelli; M. Giunta
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/38686
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact