Unfinished Modernisations is a collaborative, long-term research platform on architecture and urban planning. It brings together partners from both institutional and non-institutional sectors from South-Eastern Europe: TrajekT, (Slovenia), Umetnostna galerija Maribor (Maribor Art Gallery) (Slovenia), the Croatian Architects’ Society and the Institute for Contemporary Architecture, Zagreb (Croatia), the Belgrade Architects Society, Belgrade (Serbia) and the Coalition for Sustainable Development, Skopje, (Macedonia). The project is aimed at fostering interdisciplinary research on the production of built environment in its social, political and cultural contexts. It encompasses the countries that succeeded former Yugoslavia, spanning the period from the inception of the socialist state until today. The topic of the 14 researches is the way in which divergent concepts of modernization conditioned architecture, territorial transformations, and urban phenomena. The project seeks to detect effective, resilient, and socially responsible models of architecture and urban planning in socialist Yugoslavia and its successor states. Special attention is going to be paid to critical re-reading of modernization processes and contextualization of local architectural and urban planning concepts within the framework of international evolution of architectural discourse. While largely unexplored and lacking appropriate interpretation, many of the models created in the region were original and experimental and may be used as inspiration for a progressive current practice both inside and beyond the regional borders. The project also seeks to reconstruct an important segment of the shared history of Central and South-Eastern Europe and to strengthen cross-cultural respect and understanding through trans-national collaboration and mobility. The project is divided into four thematic segments with corresponding symposia/workshops: Critical Theory and Historical Reinterpretations; Outlining the Phenomena and Mediating Architecture; Transitional and Post-transitional Conditions; Current Practises and Perspectives. Unfinished Modernisations will be carried out through a variety of activities: 14 researches, 5 conferences (Zagreb, Skopje, Beograd, Split, Ljubljana), exhibitions, publications, and interactive web-site/blogs. All these efforts will culminate in a final exhibition in Maribor (Slovenia), the 2012 Cultural Capital of Europe, which will give the project broad European exposure.

INES TOLIC (2012). The Borba for architecture.

The Borba for architecture

TOLIC, INES
2012

Abstract

Unfinished Modernisations is a collaborative, long-term research platform on architecture and urban planning. It brings together partners from both institutional and non-institutional sectors from South-Eastern Europe: TrajekT, (Slovenia), Umetnostna galerija Maribor (Maribor Art Gallery) (Slovenia), the Croatian Architects’ Society and the Institute for Contemporary Architecture, Zagreb (Croatia), the Belgrade Architects Society, Belgrade (Serbia) and the Coalition for Sustainable Development, Skopje, (Macedonia). The project is aimed at fostering interdisciplinary research on the production of built environment in its social, political and cultural contexts. It encompasses the countries that succeeded former Yugoslavia, spanning the period from the inception of the socialist state until today. The topic of the 14 researches is the way in which divergent concepts of modernization conditioned architecture, territorial transformations, and urban phenomena. The project seeks to detect effective, resilient, and socially responsible models of architecture and urban planning in socialist Yugoslavia and its successor states. Special attention is going to be paid to critical re-reading of modernization processes and contextualization of local architectural and urban planning concepts within the framework of international evolution of architectural discourse. While largely unexplored and lacking appropriate interpretation, many of the models created in the region were original and experimental and may be used as inspiration for a progressive current practice both inside and beyond the regional borders. The project also seeks to reconstruct an important segment of the shared history of Central and South-Eastern Europe and to strengthen cross-cultural respect and understanding through trans-national collaboration and mobility. The project is divided into four thematic segments with corresponding symposia/workshops: Critical Theory and Historical Reinterpretations; Outlining the Phenomena and Mediating Architecture; Transitional and Post-transitional Conditions; Current Practises and Perspectives. Unfinished Modernisations will be carried out through a variety of activities: 14 researches, 5 conferences (Zagreb, Skopje, Beograd, Split, Ljubljana), exhibitions, publications, and interactive web-site/blogs. All these efforts will culminate in a final exhibition in Maribor (Slovenia), the 2012 Cultural Capital of Europe, which will give the project broad European exposure.
2012
2010
INES TOLIC (2012). The Borba for architecture.
INES TOLIC
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/262112
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact