This paper investigates the economical feasibility of four-phase (4P) overhead transmission lines, considered as a possible alternative to the traditional three-phase (3P) connections. The paper performs an economical comparison between innovative 4P transmission lines and traditional 3P lines, with the goal of evaluating the contests where a 4P connection could become con-venient, accounting for different reliability, land occupation, vis-ual impact, energy losses and investment costs.
Four-phase AC connections: an alternative possibility for the expansion of transmission grids / G. Mazzanti; S. Quaia. - In: IEEE TRANSACTIONS ON POWER DELIVERY. - ISSN 0885-8977. - STAMPA. - 25, No. 2:(2010), pp. 1010-1018. [10.1109/TPWRD.2009.2035702]
Four-phase AC connections: an alternative possibility for the expansion of transmission grids
MAZZANTI, GIOVANNI;
2010
Abstract
This paper investigates the economical feasibility of four-phase (4P) overhead transmission lines, considered as a possible alternative to the traditional three-phase (3P) connections. The paper performs an economical comparison between innovative 4P transmission lines and traditional 3P lines, with the goal of evaluating the contests where a 4P connection could become con-venient, accounting for different reliability, land occupation, vis-ual impact, energy losses and investment costs.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.