In this study, the off-design performances of a Power-to-Gas process are predicted by means of a developed calculation model. The numerical code has been developed in commercial tool environments in order to carry out a preliminary analysis of the Power-to-Gas system. In addition, with the aim to predict co-electrolysis behaviour under several conditions, a specific calculation model has been integrated in the whole system model. Then, starting from a real wind production profile, two configurations (pressurized and at ambient pressure) of the Power-to-Gas system have been analysed, evaluating the weekly operating time of the integrated Power-to-gas/wind systems. The comparison has been made on the basis of the evaluation of the instantaneous and mean values of the considered performance parameters. The system at ambient pressure shows better performance from the point of view of the efficiencies, while the pressurized system presents a higher methane production.

Preliminary off-design performance evaluation of a P2G system coupled with renewables / M. A. Ancona, M. Bianchi, L. Branchini, F. Catena, A. De Pascale, F. Melino, A. Peretto. - ELETTRONICO. - (2019), pp. 153.1-153.14. (Intervento presentato al convegno SDEWES Conference tenutosi a Dubrovnik, Croatia nel October 1-6, 2019).

Preliminary off-design performance evaluation of a P2G system coupled with renewables

M. A. Ancona;M. Bianchi;L. Branchini;F. Catena;A. De Pascale;F. Melino;A. Peretto
2019

Abstract

In this study, the off-design performances of a Power-to-Gas process are predicted by means of a developed calculation model. The numerical code has been developed in commercial tool environments in order to carry out a preliminary analysis of the Power-to-Gas system. In addition, with the aim to predict co-electrolysis behaviour under several conditions, a specific calculation model has been integrated in the whole system model. Then, starting from a real wind production profile, two configurations (pressurized and at ambient pressure) of the Power-to-Gas system have been analysed, evaluating the weekly operating time of the integrated Power-to-gas/wind systems. The comparison has been made on the basis of the evaluation of the instantaneous and mean values of the considered performance parameters. The system at ambient pressure shows better performance from the point of view of the efficiencies, while the pressurized system presents a higher methane production.
2019
Proc. Of: 14th SDEWES Conference.
1
14
Preliminary off-design performance evaluation of a P2G system coupled with renewables / M. A. Ancona, M. Bianchi, L. Branchini, F. Catena, A. De Pascale, F. Melino, A. Peretto. - ELETTRONICO. - (2019), pp. 153.1-153.14. (Intervento presentato al convegno SDEWES Conference tenutosi a Dubrovnik, Croatia nel October 1-6, 2019).
M. A. Ancona, M. Bianchi, L. Branchini, F. Catena, A. De Pascale, F. Melino, A. Peretto
File in questo prodotto:
Eventuali allegati, non sono esposti

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11585/706137
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact