Sfoglia per Autore
Mostrati risultati da 1 a 9 di 9
Solution of the Train Platforming Problem
2007 A. Caprara; L. Galli; P. Toth
Recoverable Robustness for Railway Rolling Stock Planning
2008 V. Cacchiani; A. Caprara; L. Galli; L. Kroon; G. Maroti; P. Toth
Recovery-Robust Platforming by Network Buffering
2009 A. Caprara; L. Galli; S. Stiller; P. Toth
Recoverable Robustness for Scheduling with Precedence Constraints
2009 A. Caprara; L. Galli; S. Stiller; P. Toth
Robust Train Routing and Online Re-scheduling
2010 A. Caprara; L. Galli; L. Kroon; G. Maroti; P. Toth
An Electromagnetism Metaheuristic for the Unicost Set Covering Problem
2010 Z. Naji-Azimi;P. Toth;L. Galli
Solution of the Train Platforming Problem
2011 A. Caprara; L. Galli; P. Toth
Railway Rolling Stock Planning: Robustness Against Large Disruptions
2012 Cacchiani V.; Caprara A.; Galli L.; Kroon L.; Maroti G.; Toth P.
Delay-Robust Event Scheduling
2014 Alberto Caprara;Laura Galli;Sebastian Stiller;Paolo Toth
Titolo | Autore(i) | Anno | Periodico | Editore | Tipo | File |
---|---|---|---|---|---|---|
Solution of the Train Platforming Problem | A. Caprara; L. Galli; P. Toth | 2007-01-01 | - | IBFI | 4.01 Contributo in Atti di convegno | - |
Recoverable Robustness for Railway Rolling Stock Planning | V. Cacchiani; A. Caprara; L. Galli; L. Kroon; G. Maroti; P. Toth | 2008-01-01 | - | Scloss Dagsthul - Leibniz - Zentrum fuer Informatik | 4.01 Contributo in Atti di convegno | - |
Recovery-Robust Platforming by Network Buffering | A. Caprara; L. Galli; S. Stiller; P. Toth | 2009-01-01 | - | Swiss Federal Institute of Technology ETH Zurich | 4.01 Contributo in Atti di convegno | - |
Recoverable Robustness for Scheduling with Precedence Constraints | A. Caprara; L. Galli; S. Stiller; P. Toth | 2009-01-01 | - | s.n | 4.01 Contributo in Atti di convegno | - |
Robust Train Routing and Online Re-scheduling | A. Caprara; L. Galli; L. Kroon; G. Maroti; P. Toth | 2010-01-01 | - | IBFI | 4.01 Contributo in Atti di convegno | - |
An Electromagnetism Metaheuristic for the Unicost Set Covering Problem | Z. Naji-Azimi;P. Toth;L. Galli | 2010-01-01 | EUROPEAN JOURNAL OF OPERATIONAL RESEARCH | - | 1.01 Articolo in rivista | - |
Solution of the Train Platforming Problem | A. Caprara; L. Galli; P. Toth | 2011-01-01 | TRANSPORTATION SCIENCE | - | 1.01 Articolo in rivista | - |
Railway Rolling Stock Planning: Robustness Against Large Disruptions | Cacchiani V.; Caprara A.; Galli L.; Kroon L.; Maroti G.; Toth P. | 2012-01-01 | TRANSPORTATION SCIENCE | - | 1.01 Articolo in rivista | - |
Delay-Robust Event Scheduling | Alberto Caprara;Laura Galli;Sebastian Stiller;Paolo Toth | 2014-01-01 | OPERATIONS RESEARCH | - | 1.01 Articolo in rivista | - |
Mostrati risultati da 1 a 9 di 9
Legenda icone
- file ad accesso aperto
- file disponibili sulla rete interna
- file disponibili agli utenti autorizzati
- file disponibili solo agli amministratori
- file sotto embargo
- nessun file disponibile